Demolition Images

This page contains images and videos related to the decommissioning and demolition of Navajo Generating Station. Click on an image to enlarge it. Push Play to watch a video.


Here’s an aerial view of the NGS stack demolition that took place on December 18, 2020. Courtesy of EcoFlight, this video is hosted on their YouTube channel at https://www.youtube.com/channel/UCQfVR3–WySBu8b4JQmzEXA and shared here.


NGS Boiler Demolition

The boilers came down about 9:20 AM on March 3rd, 2021. I captured it on video and you can watch it HERE. Click on the image to the right to enlarge.


New Landscape

Here’s a look at the new landscape at NGS following the stack demolition. The damaged remains of the 1B cooling tower are on the left.


Stack Implosion Aftermath

This was taken shortly after the stack demolition. It was taken from the northwest, looking at the unit 1&2 power block.


NGS Stack Implosion

The stacks at NGS were brought down on December 18, 2020. This image was taken from the city of Page. Click image to enlarge.


NGS Stack Implosion

Here’s a view of the NGS stack implosion from on-site at Navajo Generating Station. December 18, 2020. Click image to enlarge,


Stackless NGS

I took this photo on December 19,2020, the day after the stack implosion. It was a sad sight. Click to enlarge.


Unit 1&2 Precips – Last Day.

The stacks are gone and the U3 precips are already down (the left side of the image). This was a still from the moments before the precips were imploded on January 19, 2021. The video is below. Click the image to enlarge.


VIDEO: NGS Stack Implosion – Short Version. Recorded by me on 12-18-2020.

VIDEO: NGS Stack Implosion – Full Version with Commentary and Background

VIDEO: Demolition of U1&2 Precipitators

Need to contact me?