NGS Coal Yard Construction 03/08/202103/08/2021 / Mike Adams This photo was taken from somewhere on the U1 boiler structure. The dewatering bins and the U1&2 fly ash bin are under construction. The train’s in the background. Click to enlarge. There’s a lot of detail to see in this one. Share this:Click to share on Twitter (Opens in new window)Click to share on Facebook (Opens in new window)Click to share on Tumblr (Opens in new window)Click to share on LinkedIn (Opens in new window)Click to share on Reddit (Opens in new window)Click to share on Pocket (Opens in new window)Click to share on Telegram (Opens in new window)Click to share on WhatsApp (Opens in new window)Click to share on Skype (Opens in new window)Click to email a link to a friend (Opens in new window)Click to print (Opens in new window)Like this:Like Loading... Related